Crosswalk construction at Bren Road East
Bren Road East
- The pedestrian crosswalk is currently under construction.
- Roadway striping will occur following crosswalk construction.
Red Circle Drive
- Sod was installed this week.
- Traffic was shifted to the north side of the road.
- The south side of the road will be reclaimed this week.
- New curb along the south side of the road will be installed the week of Sept. 7.
Shady Oak Road
- Work has begun on the new 10 foot sidewalk along Shady Oak Road.
- Crews have started removals of existing curbs and sidewalks.
- Road reclaiming is scheduled for this week on Red Circle Drive (south).