Bren Road East

  • The pedestrian crosswalk is currently under construction.
  • Roadway striping will occur following crosswalk construction.

Red Circle Drive

  • Sod was installed this week.
  • Traffic was shifted to the north side of the road.
  • The south side of the road will be reclaimed this week.
  • New curb along the south side of the road will be installed the week of Sept. 7.

Shady Oak Road

  • Work has begun on the new 10 foot sidewalk along Shady Oak Road.
  • Crews have started removals of existing curbs and sidewalks.
  • Road reclaiming is scheduled for this week on Red Circle Drive (south).