Restoration scheduled for Bren Road East work

Bren Road East

  • Electrical work related to the new pedestrian crossing was installed
  • New concrete was installed
  • Crews paved the first layer of asphalt
  • A section of the 10 foot wide trail was paved
  • Restoration and final paving is scheduled for Aug. 24

Red Circle Drive

  • Curb and gutter along with concrete driveway pavement was installed this week
  • Remaining concrete work is scheduled for Aug. 24
  • Trail and roadway paving is scheduled for later next week