Application submitted
Xcel Energy is proposing to add and replace electrical poles along an existing power line, which requires a conditional use permit and site and building plan review. Some of the poles require a variance due to them exceeding the maximum allowed height. In addition, some of the existing poles are located within wetlands and floodplains. The replacement of these poles will require floodplain and wetland alteration permits.
Share Application submitted on Facebook
Share Application submitted on Twitter
Share Application submitted on Linkedin
Email Application submitted link
Thank you for your contribution!
Help us reach out to more people in the community
Share this with family and friends